JUDGMENT OF THE COURT OF FIRST INSTANCE (Eighth Chamber, Extended Composition)
11 June 2009 (*)
(State aid Scheme of aid granted by the Italian authorities to certain public utilities in the form of tax exemptions and loans at preferential rates Decision declaring the aid incompatible with the common market Actions for annulment Not individually concerned Inadmissibility)
In Case T-09/02,
Acegas-APS SpA, formerly Acqua, Elettricità , Gas e servizi SpA (Acegas), established in Trieste (Italy), represented by F. Devescovi, F. Ferletic, L. Daniele, F. Spitareli and S. Gobbato, lawyers,
applicant,
v
Commission of the European Communities, represented by V. Di Bucci, acting as Agent,
defendant,
APPLICATION for annulment of Articles 2 and 3 of Commission Decision 2003/193/EC of 5 June 2002 on State aid granted by Italy in the form of tax exemptions and subsidised loans to public utilities with a majority public capital holding (OJ 2003 L 77, p. 21),
THE COURT OF FIRST INSTANCE OF THE EUROPEAN COMMUNITIES (Eighth Chamber, Extended Composition),
composed of E. Martins Ribeiro, President of the Chamber, D. Šváby, S. Papasavvas, N. Wahl (Rapporteur) and A. Dittrich, Judges,
Registrar: J. Palacio González, Principal Administrator,
having regard to the written procedure and further to the hearing on 16 April 2008,
gives the following
Judgment
Background to the dispute
- The applicant, Acegas-APS SpA, formerly Acqua, Elettricità , Gas e servizi SpA (Acegas), is a capital company in which the majority of shares are held by the city of Trieste (Italy). It was established in 1997 following the restructuring of the municipal undertaking Azienda Comunale Elettricità Gas e Acqua and assumed that undertaking's rights and obligations. The instrument of incorporation of the applicant company provides that the public services formerly provided by the municipal undertaking are to be allocated to it. In accordance with its object, the applicant primarily provides services for the distribution of water, electricity and methane gas as well as for the removal, transport and treatment of waste in the city of Trieste and in a number of municipalities in the Province of Trieste. Its articles of association provide that the applicant can also engage in activities in complementary areas, in areas entrusted to it by the city of Trieste or, by prior agreement with that city, by other public or private entities.
National legal context
- Legge No 142 ordinamento delle autonomie locali (Law No 142 on the organisation of local authorities of 8 June 1990, GURI No 135 of 12 June 1990) ('Law No 142/90') brought about a reform in Italy of the legal arrangements available to municipalities for the management of public services, in particular in the water, gas and electricity distribution sectors and in the transport sector. Under Article 22 of that law, as amended, municipalities can set up companies in a variety of legal forms to provide public services. Those include joint stock companies and limited liability companies with a majority public shareholding ('companies set up under Law No 142/90'). The applicant is a company set up under Law No 142/90.
- In that context, under Article 9a of Legge No 488 di conversione in legge, con modificazioni, del decreto-legge 1° luglio 1986, n° 318, recante provvedimenti urgenti per la finanza locale (Law No 488 of 9 August 1986 converting and amending Decree Law No 318 of 1 July 1986 and introducing urgent provisions for financing local authorities, GURI No 190 of 18 August 1986), loans were granted between 1994 and 1998 at a preferential rate of interest by the Cassa Depositi e Prestiti ('the CDDPP') to companies set up under Law No 142/90 providing public services ('the CDDPP loans').
- Moreover, under Article 3(69) and (70) of Legge No 549 (su) misure di razionalizzazione della finanza pubblica (Law No 549 on measures to rationalise public finances of 28 December 1995, Ordinary Supplement to GURI No 302 of 29 December 1995) ('Law No 549/95'), in conjunction with Decreto-Legge No 331 (su) armonizzazione delle disposizioni in materia di imposte sugli oli minerali, sull'alcole, sulle bevande alcoliche, sui tabacchi lavorati e in materia di IVA con quelle recate da direttive CEE e modificazioni conseguenti a detta armonizzazione, nonché disposizioni concernenti la disciplina dei centri autorizzati di assistenza fiscale, le procedure dei rimborsi di imposta, l'esclusione dall'ILOR dei redditi di impresa fino all'ammontare corrispondente al contributo diretto lavorativo, l'istituzione per il 1993 di un'imposta erariale straordinaria su taluni beni ed altre disposizioni tributarie (Decree Law No 331 harmonising tax provisions in various fields of 30 August 1993, GURI No 203 of 30 August 1993) ('Decree Law No 331/93), the following measures were introduced for the benefit of companies set up under Law No 142/90:
exemption from all transfer taxes in connection with the conversion of special and municipal undertakings into companies set up under Law No 142/90 ('the transfer tax exemption');
a three-year income tax exemption, namely in respect of the tax on the incomes of legal persons and local income tax, up to the tax year 1999 ('the three-year income tax exemption').
Aadministrative procedure
- After receiving a complaint concerning those measures, the Commission asked the Italian authorities for information in that regard by letters of 12 May, 16 June and 21 November 1997.
- By letter of 17 December 1997, the Italian authorities provided some of the information requested. A meeting was then held at the request of the Italian authorities on 19 January 1998.
- By letter of 17 May 1999, the Commission informed the Italian authorities that it had decided to initiate the procedure laid down in Article 88(2) EC. That decision was published in the Official Journal of the European Communities (OJ 1999 C 220, p. 14).
- After receiving comments from interested parties and the Italian authorities, the Commission asked the latter for additional information on a number of occasions. Meetings were also held between the Commission and, respectively, the Italian authorities and the interested parties involved.
- Certain companies set up under Law No 142/90, including ACEA SpA, AEM SpA and Azienda Mediterranea Gas e Acqua SpA (AMGA), which also instigated proceedings for the annulment of the decision at issue in this case (Cases T-97/02, T-01/02 and T-00/02 respectively), argued in particular that the three types of measure in question did not constitute State aid.
- The Italian authorities and the Confederazione Nazionale dei Servizi (Confservizi), a confederation of, inter alia, companies set up under Law No 142/90 and special municipal undertakings in Italy, essentially supported that position.
- On the other hand, the Bundesverband der deutschen Industrie eV (BDI), a German association for industry and suppliers of related services, was of the view that the measures in question could bring about distortions of competition not only in Italy but also in Germany.
- Similarly, Gas it, an Italian association of private operators in the gas distribution sector, stated that the measures in question, in particular the three-year income tax exemption, constituted State aid.
- On 5 June 2002, the Commission adopted Decision 2003/193/EC on State aid granted by Italy in the form of tax exemptions and subsidised loans to companies set up under Law No 142/90 (OJ 2003 L 77, p. 21) ('the contested decision').
The contested decision
- The Commission points out, first of all, that its analysis concerns only the aid schemes of general application introduced by the contested measures and not individual grants of aid to particular undertakings and its analysis in the contested decision is therefore general and abstract. It states that the Italian Republic 'did not grant the tax advantages on an individual basis or notify any individual cases to [it], together with all the information necessary for the Commission to assess it'. The Commission states that it therefore considered itself bound to carry out a general and abstract examination of the schemes in question in order to determine both whether they constituted State aid and whether such aid was compatible with the common market (recitals 42 to 45 of the preamble to the contested decision).
- According to the Commission, the CDDPP loans and the three'year income tax exemption (together, 'the contested measures') are State aid. The effect of such advantages being conferred through State resources on companies set up under Law No 142/90 is to strengthen their competitive position by comparison with that of all other undertakings wishing to supply the same services (recitals 48 to 75 of the preamble to the contested decision). The contested measures are incompatible with the common market because they meet the requirements of neither Article 87(2) and (3) EC nor Article 86(2) EC and, furthermore, infringe Article 43 EC (recitals 94 to 122 of the preamble to the contested decision).
- On the other hand, according to the Commission, the transfer tax exemption does not constitute State aid within the meaning of Article 87(1) EC, since such taxes are payable on the creation of a new economic entity or the transfer of assets between different economic entities. Municipal undertakings and the companies set up under Law No 142/90 are, substantially, the same economic entities. Exemption from those taxes for such companies is therefore justified by the nature or general scheme of the system (recitals 76 to 81 of the preamble to the contested decision).
- The enacting terms of the contested decision are worded as follows:
'Article 1
The exemption from transfer tax ... does not constitute aid within the meaning of Article 87(1) [EC].
Article 2
The three-year exemption from income tax ... and the advantages resulting from [CDDPP] loans constitute State aid within the meaning of Article 87(1) [EC].
Such aid is incompatible with the common market.
Article 3
Italy shall take all necessary measures to recover from the beneficiaries the aid granted under the schemes referred to in Article 2 and unlawfully made available to the beneficiaries.
Recovery shall be effected without delay and in accordance with the procedures of national law provided that they allow the immediate and effective execution of the [contested] decision.
The aid to be recovered shall include interest from the date on which it was at the disposal of the beneficiaries until the date of its recovery. Interest shall be calculated on the basis of the reference rate used for calculating the grant equivalent of regional aid.
...'
Procedure and forms of order sought by the parties
- By application lodged at the Registry of the Court of First Instance on 9 October 2002, the applicant brought the present action.
- By separate document, lodged at the Court Registry on 6 January 2003, the Commission raised a plea of inadmissibility under Article 114(1) of the Rules of Procedure of the Court of First Instance.
- The applicant submitted its observations on the plea of inadmissibility on 28 February 2003.
- On 8 August 2002, the Italian Republic also brought an action for annulment on the contested decision before the Court of Justice, which was registered as Case C-90/02. The Court of Justice considered that that action and those in Cases T-92/02, T-97/02, T-00/02, T-01/02 and T-09/02 concerned the same subject matter, namely the annulment of the contested decision, and were connected, since the pleas put forward in each of the cases overlapped to a very large extent. By order of 10 June 2003, the Court of Justice stayed the proceedings in Case C-90/02 in accordance with the third paragraph of Article 54 of its Statute pending the final decision of the Court of First Instance in Cases T-92/02, T-97/02, T-00/02, T-01/02 and T-09/02.
- By order of 8 June 2004, the Court of Justice decided to refer Case C-90/02 to the Court of First Instance, upon which jurisdiction has been conferred to adjudicate on actions brought by Member States against the Commission, in accordance with Article 2 of Council Decision 2004/407/EC, Euratom of 26 April 2004 amending Articles 51 and 54 of the Protocol on the Statute of the Court of Justice (OJ 2004 L 132, p. 5). That case was thus registered at the Registry of the Court of First Instance under reference T-22/04.
- By order of 5 August 2004, the Court of First Instance decided to reserve its decision on the plea of admissibility raised by the Commission until the judgment in the main proceedings.
- Upon hearing the report of the Judge-Rapporteur, the Court of First Instance (Eighth Chamber, Extended Composition) decided to open the oral procedure and, by way of measures of organisation of procedure provided for in Article 64 of the Rules of Procedure, put written questions to the parties, to which they replied within the prescribed period.
- By order of the President of the Eighth Chamber, Extended Composition, of the Court of First Instance of 13 March 2008, Cases T-92/02, T-97/02, T-00/02, T-01/02, T-09/02, T-89/03 and T-22/04 were joined for the purposes of the oral procedure, in accordance with Article 50 of the Rules of Procedure.
- The parties presented oral argument and replied to the questions put by the Court at the hearing which took place on 16 April 2008.
- The applicant claims that the Court should:
declare the action admissible;
annul the contested decision;
in the alternative, annul Article 3 of the contested decision in so far as it requires the Italian Republic to recover the aid in question;
order the Commission to pay the costs.
- The Commission contends that the Court should:
dismiss the action as inadmissible;
in the alternative, dismiss the action as unfounded;
order the applicant to pay the costs.
Admissibility
Arguments of the parties
- First, the Commission maintains that the applicant has no legal interest in bringing proceedings in so far as its action seeks the annulment of Article 2 of the contested decision as regards the loans at preferential rates granted by the CDDPP. Indeed, there is nothing in the documents before the Court to indicate that the applicant benefited from such loans.
- Next, the Commission denies that the applicant has locus stand on the ground that the contested decision is not of individual concern to it within the meaning of the fourth paragraph of Article 230 EC.
- The Commission submits, in essence, that the contested decision is to be regarded as a measure of general application since it concerns an aid scheme and, therefore, an indeterminate and indeterminable number of undertakings defined by reference to a general criterion, such as the fact that they belong to a particular category of undertakings. In its view, the general applicability, and thus the legislative nature, of a measure are not called into question by the fact that it is possible to determine more or less exactly the number or even the identity of the persons to whom it applies at any given time, as long as it applies to them by virtue of an objective legal or factual situation defined by the measure in question in relation to its purpose.
- According to the Commission, in order for a person to be individually affected by a measure of general application, that measure must adversely affect that person's specific rights or the institution which adopted the measure must be under an obligation to take account of the effects of the measure on that person's situation. However, the Commission is of the view that that is not the case here. The contested decision has had an impact on the situation of all the undertakings which benefited from the contested measures. Consequently, the decision has not infringed rights which are specific to certain undertakings that can be distinguished from any other undertaking which benefited from the measure in question. Moreover, in adopting the contested decision, the Commission neither should nor could have taken account of the effects of its decision on the situation of a particular undertaking. Neither the declaration of incompatibility nor the order for recovery in the contested decision referred to the situation of individual beneficiaries.
- Next, the Commission is of the view that its analysis is confirmed by the existing case'law on State aid, which establishes that the fact an undertaking has received State aid that has been declared incompatible with the common market is not sufficient to demonstrate that the undertaking is individually concerned for the purpose of the fourth paragraph of Article 230 EC.
- A number of more recent cases do not call into question the established case'law. According to the Commission, the approach adopted in Joined Cases C-5/98 and C-05/99 Italy and Sardegna Lines v Commission [2000] ECR I-8855 ('the judgment in Sardegna Lines') cannot be applied to all actions brought by recipients of an aid scheme that has been declared unlawful and incompatible and in respect of which an order for recovery has been made. That is the inevitable conclusion in particular where, as in the present case, the aid scheme in question has been analysed in an abstract manner. Furthermore, in the case which gave rise to the judgment in Sardegna Lines, the applicant was an actual beneficiary of individual aid since an advantage was conferred on it by virtue of a measure adopted on the basis of a regional law which allowed for a wide margin of discretion. Moreover, that situation was closely scrutinised in the course of the formal investigation procedure.
- The facts of the case also differ from those which gave rise to the judgment in Case C-98/00 P Italy v Commission [2004] ECR I-4087 ('the judgment in Alzetta') in so far as, in the present case, the Commission was unaware of either the exact number or the identity of the beneficiaries of the aid in question, did not have available to it all the relevant information and was unaware of the amount of aid granted in each case. Moreover, in this case, the three'year income tax exemption applied automatically, whereas the aid in question in the case which gave rise to the judgment in Alzetta was granted under a later measure.
- Contrary to the applicant's submissions, what matters for the purpose of examining admissibility is not knowledge of the identity of an undertaking but the fact that the Commission's attention has been drawn to specific features of the case which justify individual scrutiny. The Commission stated in the contested decision that it had not been provided with any information to demonstrate that, as regards the applicant, the measure at issue did not constitute aid or constituted existing aid or aid compatible with the common market.
- In any event, neither the fact that it participated in the formal investigation procedure laid down in Article 88(2) EC nor the order for recovery in the contested decision is sufficient, in the Commission's view, to distinguish the applicant individually. Given that actions brought by potential beneficiaries of a notified aid scheme are inadmissible for the purpose of Article 230 EC, the same should apply to actions brought by beneficiaries of an unnotified aid scheme.
- Lastly, the Commission maintains that if the action brought by the applicant in the present case were to be declared inadmissible, that would not infringe the principle of effective judicial protection, since the remedies provided for in Articles 241 EC and 234 EC would be sufficient (Case C-0/00 P Unión de Pequeños Agricultores v Council [2002] ECR I-6677) ('the judgment in UPA').
- With regard to its interest in bringing proceedings, the applicant states that it is a majority publicly owned company constituted under Law No 142/90 and is therefore covered by the three'year income tax exemption. As regards the CDDPP loans, it observes that the contested decision does not specify their temporal scope. Indeed, the period over which the CDDPP loans had to be granted if they were to be regarded as incompatible with the common market is not specified. It is therefore difficult to know whether the applicant actually benefited from the loans. The contested decision thus gives rise to considerable legal uncertainty as regards the applicant. Moreover, the Italian authorities sent to the applicant a request for information for the purpose of recovering the aid relating to the CDDPP loans. The applicant therefore considers that it has an interest in bringing proceedings. It states in its reply that it is willing to withdraw its application in so far as it relates to the CDDPP loans provided that the Commission expressly confirms that the contested decision is directed only at CDDPP loans granted between 1994 and 1998. In that case, the applicant requests that, for the purposes of apportioning the costs, account should be taken of the uncertainty arising from the contested decision as regards the CDDPP loans.
- As to whether the applicant is individually affected by the contested decision, the applicant does not accept that it is a measure of general application.
- The applicant submits that it is apparent from the case'law on the admissibility of actions brought by actual beneficiaries of an aid scheme (the judgments in Sardegna Lines and Alzetta) that it is individually concerned. It is clear from that case'law that the two conditions to be satisfied in order for a party to be regarded as individually concerned are that it is an actual beneficiary of an aid scheme and is under an obligation to repay the aid already received. Those conditions are satisfied in the present case.
- The Commission cannot restrict the scope of the judgment in Sardegna Lines by stating that that case concerned individual aid. The fact that the applicant in the case which gave rise to that judgment was granted aid under an individual measure implementing the aid scheme is intrinsic to the scheme itself. In actual fact, that case concerned an aid scheme.
- The applicant considers the Commission's assertion that the contested decision concerns an indeterminate and indeterminable number of undertakings to be incorrect. In its view, on the contrary, the undertakings in question form a closed group, namely a group of municipal undertakings transformed into companies set up under Law No 142/90 which commenced their activities before 31 December 1999 and/or took out CDDPP loans between 1994 and 1998. Moreover, the Commission is perfectly well aware of the names of those companies.
- Lastly, in support of its application, the applicant relies on the right to judicial protection. If the present action were found to be admissible, the full and effective judicial protection of individuals would be guaranteed, in accordance with Articles 6 and 13 of the Convention for the Protection of Human Rights and Fundamental Freedoms (ECHR) signed at Rome on 4 November 1950 and Article 47 of the Charter of Fundamental Rights of the European Union proclaimed at Nice on 7 December 2000 (OJ 2000 C 364, p. 1).
Findings of the Court
- According to the fourth paragraph of Article 230 EC, a natural or legal person may institute proceedings against a decision addressed to another person only if that decision is of direct and individual concern to him.
- As regards the requirement under that provision that a person must be individually concerned, according to established case'law, natural or legal persons other than the addressees may claim that a decision is of individual concern to them only if that decision affects them by reason of certain attributes which are peculiar to them, or by reason of factual circumstances which differentiate them from all other persons and thereby distinguish them individually in the same way as the person addressed (Case 25/62 Plaumann v Commission [1963] ECR 95, at 107, and Case C-21/95 P Greenpeace Council and Others v Commission [1998] ECR I-1651, paragraphs 7 and 28).
- Accordingly, the Court of Justice has held that an undertaking cannot, as a general rule, bring an action for the annulment of a Commission decision prohibiting a sectoral aid scheme if it is concerned by that decision solely by virtue of the fact that it belongs to the sector in question and is a potential beneficiary of the scheme. Such a decision is, vis-à -vis the applicant undertaking, a measure of general application covering situations which are determined objectively and entails legal effects for a class of persons envisaged in a general and abstract manner (see Joined Cases 67/85, 68/85 and 70/85 Van der Kooy and Others v Commission [1988] ECR 219, paragraph 15, and the judgment in Alzetta, paragraph 37 and the case'law cited).
- However, the Court of Justice also held, at paragraphs 34 and 35 of the judgment in Sardegna Lines, that since the undertaking Sardegna Lines was concerned by the decision at issue in that case not only as an undertaking in the shipping sector in Sardinia and a potential beneficiary of the aid scheme for Sardinian shipowners but also as an actual recipient of individual aid granted under that scheme, recovery of which had been ordered by the Commission, it was individually concerned by the decision and the action which it brought against it was admissible (see also, to that effect, the judgment in Alzetta, paragraph 39).
- Accordingly, it is appropriate to determine whether the applicant is an actual recipient of individual aid granted under a sectoral aid scheme, recovery of which has been ordered by the Commission (see, to that effect, Case T-36/05 Salvat père et fils and Others v Commission [2007] ECR II-4063, paragraph 70).
- With regard, first, to the three'year income tax exemption, the applicant claims that, since it is a company covered by the scheme in question, it is an actual beneficiary of the scheme, although it is not able to state the amount of aid which it received.
- It is apparent from the written answer of the Italian Republic to the written question put by the Court that the applicant declared a loss for tax purposes for the relevant period and, therefore, its assessment to tax was effectively nil.
- However, it is also clear from that answer that the tax authorities undertook an investigation which brought to light a number of irregularities in the applicant's tax returns. Following that investigation, the applicant was granted its request for the application of the scheme under Article 9 of Law No 289 relating to the provisions for drawing up the annual and pluriannual budget of the State (legge n. 289, disposizioni per la formazione del bilancio annuale e pluriennale dello Stato, of 27 September 2002) (Ordinary Supplement No 240/L to GURI No 305 of 31 December 2002, 'the tax amnesty') for the period 1997 to 2002. Under the amnesty mechanism, by making a flat'rate payment, it is possible to ensure that no further investigations are made and all ongoing proceedings are brought to an end. Furthermore, it is apparent from the information provided by the Commission at the hearing, which was not challenged by the Italian Republic, that a tax amnesty is definitive, so that no sums paid under the amnesty scheme can be reimbursed.
- It should be noted, in that connection, that the applicant has not explained how the amount which it has paid or intends to pay relates to the years 1997 to 1999, given that the tax amnesty which it benefited from covers the years 1997 to 2000, or how that remission of its debts in consideration for the payment of a lump sum relates to the scheme in question.
- In the absence of any convincing evidence to establish that it actually benefited from the scheme in question, the applicant cannot be regarded as being individually concerned by the contested decision.
- With regard to the applicant's argument that it belongs to a closed group of undertakings and that the Commission is perfectly well aware of the names of the undertakings in that group, it must be borne in mind that the fact that it is possible to determine more or less precisely the number, or even the identity, of the persons to whom a measure applies by no means implies that it must be regarded as being of individual concern to them, as long as it is established that, as in the present case, that application takes effect by virtue of an objective legal or factual situation defined by the measure in question (Case C-51/98 Antillean Rice Mills v Council [2001] ECR I-8949, paragraph 52, and the order in Case T-08/03 von Pezold v Commission [2005] ECR II-655, paragraph 46).
- The applicant's argument based on the requirements of effective judicial protection does not alter that conclusion. First, the Court of Justice confirmed its established case'law on the interpretation of the fourth paragraph of Article 230 EC in its judgment in Case C-63/02 P Commission v Jégo-Quéré [2004] ECR I-3425 and in its judgment in UPA. Second, while the requirement of individual concern laid down by the fourth paragraph of Article 230 EC must be interpreted in the light of the principle of effective judicial protection by ensuring that account is taken of the various circumstances that may distinguish an applicant individually, such an interpretation cannot have the effect of setting aside that requirement (UPA, paragraph 44).
- Finally, as regards the CDDPP loans, it is apparent from the written procedure that, after the Commission had confirmed in its rejoinder that the contested decision concerned only the CDDPP loans granted between 1994 and 1998, the applicant withdraw its application in so far as it related to those loans.
- Moreover, in view of the fact that it is perfectly clear from the contested decision that the relevant period relates only to the years 1994 to 1998, the applicant's request concerning the apportionment of the costs must be rejected.
- It follows from all the foregoing considerations that the contested decision cannot be regarded as being of individual concern to the applicant within the meaning of the fourth paragraph of Article 230 EC and the action must therefore be dismissed in its entirety as inadmissible.
Costs
- In accordance with Article 87(2) of the Rules of Procedure, the unsuccessful party is to be ordered to pay the costs if they have been applied for in the successful party's pleadings. Sine the applicant has been unsuccessful, it must be ordered to pay the costs, in accordance with the form of order sought by the Commission.
On those grounds,
THE COURT OF FIRST INSTANCE (Eighth Chamber, Extended Composition)
hereby:
1. Dismisses the action as inadmissible.
2. Orders Acegas-APS SpA to pay the costs.
Martins Ribeiro
|
Šváby
|
Papasavvas
|
Delivered in open court in Luxembourg on 11 June 2009.
[Signatures]
* Language of the case: Italian.