S.I. No. 53/1929 -- The Shannon Works Transfer (No. 5) Order, 1929.
No. 53/1929: THE SHANNON WORKS TRANSFER (No. 5) ORDER, 1929. | ||||||||||||||||||||||
THE SHANNON WORKS TRANSFER (No. 5) ORDER, 1929. | ||||||||||||||||||||||
The Shannon Works Transfer (No. 5) Order, 1929, dated the twenty-first day of October, 1929, made by the Minister for Industry and Commerce, pursuant to sub-section (1) of Section 17 of the Electricity (Supply) Act, 1927 . | ||||||||||||||||||||||
WHEREAS it is enacted by sub-section (1) of Section 17 of the Electricity (Supply) Act, 1927 (No. 27 of 1927), that when the Shannon Works are completed and handed over to the Minister for Industry and Commerce by the Contractor engaged in the construction thereof, the said Minister shall, as soon as conveniently may be, by order under his Seal hand such works over to the Electricity Supply Board, and, in the event of any portion of the Shannon Works being completed and handed over to the said Minister by the said Contractor, the said Minister may, if he so thinks fit at any time thereafter, by order under his Seal, hand over to the said Board such completed portion of the said works at any time before the completion of the whole of the said works: | ||||||||||||||||||||||
AND WHEREAS the portion of the Shannon Works more particularly described in the Schedule hereto has been completed and handed over to the said Minister by the Contractor engaged in the construction thereof: | ||||||||||||||||||||||
AND WHEREAS, in the opinion of the said Minister, it is expedient that the said portion of the Shannon Works should be handed over to the said Board as from the date of this Order: | ||||||||||||||||||||||
NOW THEREFORE I, Patrick McGilligan, Minister for Industry and Commerce, in exercise of the powers conferred on me by subsection (1) of Section 17 of the Electricity (Supply) Act, 1927 . (No. 27 of 1927), and of every and any other power me in this behalf enabling, do hereby order as follows, that is to say:— | ||||||||||||||||||||||
1. This Order may be cited for all purposes as the Shannon Works Transfer (No. 5) Order, 1929. | ||||||||||||||||||||||
2. The Interpretation Act, 1923 (No. 46 of 1923), applies to the interpretation of this Order in like manner as it applies to the interpretation of an Act of the Oireachtas. | ||||||||||||||||||||||
3. The portion of the Shannon Works more particularly described in the Schedule hereto shall be and it is hereby handed over as from the date of this Order to the Electricity Supply Board. | ||||||||||||||||||||||
| ||||||||||||||||||||||
| ||||||||||||||||||||||
SCHEDULE. | ||||||||||||||||||||||
I. No. 2 Generating Units (Units II. and III.) in the Generating Station at Ardnacrusha, complete erected, including Turbines, Generators, Penstocks, Sluices, Cranes, Lifts with all necessary controlling and governing gear, Switchgear, Transforming Plant, Instruments, Apparatus, Workshops Equipment, and all auxiliary devices and fittings, | ||||||||||||||||||||||
and set out on the plan annexed hereto. | ||||||||||||||||||||||
II. No. 184·3888 Km. of 110 kV Transmission Lines erected, complete with Foundations, Poles, Insulators, Conductors connecting the Generating Station at Ardnacrusha with the 110 kV. Transformer Station at Dublin, | ||||||||||||||||||||||
and set out on the plan annexed hereto. | ||||||||||||||||||||||
III. No. 1 110/38 kV. Transformer Station, complete with Transformers, Switchgear, Apparatus and Equipment, Building, Station enclosure, Fencing and other Ancillary Works situated at:— | ||||||||||||||||||||||
Inchicore, Dublin, | ||||||||||||||||||||||
and set out on the plan annexed hereto. | ||||||||||||||||||||||
IV. No. 16 Transformer Stations, 38/10 kV., complete with Transformers, Switchgear, Apparatus and Equipment, Buildings, Station enclosures, Fencing and other Ancillary Works situated at:— | ||||||||||||||||||||||
| ||||||||||||||||||||||
V. No. 516.98993 Km. of 38 kV. Transmission Lines erected complete with Foundations, Poles, Insulators, Conductors, connecting the Transformer Stations specified in this Schedule, | ||||||||||||||||||||||
and set out on the plan annexed hereto. | ||||||||||||||||||||||
VI. No. 356.1340, Km. of 10 kV. Transmission Lines erected, complete with Foundations, Poles, Insulators, Conductors, connecting the undermentioned towns:— | ||||||||||||||||||||||
| ||||||||||||||||||||||
Dated this 21st day of October, 1929. | ||||||||||||||||||||||
(Signed), PATRICK McGILLIGAN, | ||||||||||||||||||||||
Minister for Industry and Commerce. | ||||||||||||||||||||||
(Signed), GORDON CAMPBELL, | ||||||||||||||||||||||
Secretary, Department of Industry and Commerce. | ||||||||||||||||||||||