United Kingdom Statutory Instruments |
||
You are here: BAILII >> Databases >> United Kingdom Statutory Instruments >> The A5/A49 Trunk Roads (Shrewsbury Bypass and Improvements) (Temporary Bridge over the River Severn at Uffington, Shrewsbury) Order 1989 No. 2315 URL: http://www.bailii.org/uk/legis/num_reg/1989/uksi_19892315_en.html |
[New search] [Help]
Statutory Instruments
HIGHWAYS, ENGLAND AND WALES
Made
7th December 1989
Coming into force
5th January 1990
1. The Secretary of State is authorised to construct the temporary bridge specified in the Schedule to this Order for the purposes of transporting spoil, building materials and machinery in connection with construction of the new trunk road and the River Severn crossing at Uffington, Shrewsbury.
2. In this Order-�
(i)"the new trunk road" means the new trunk road to be constructed by the Secretary of State in pursuance of the (A5) London-Holyhead Trunk Road and Slip Roads and the(A49) Newport-Shrewsbury-Whitchurch-Warrington Trunk Road (A5/A49) Shrewsbury By-Pass and Improvements) Order 1985(3) and the (A5) London-Holyhead Trunk Road and Slip Roads and the (A49) Newport-Shrews-bury-Whitchurch-Warrington Trunk Road (A5/A49 Shrewsbury By-Pass and Improvements) (Overley Hill) (No. 2) Order 1985(4);
(ii)"the River Severn Crossing" means the bridge to be constructed by the Secretary of State over the River Severn at Uffington in pursuance of the (A5) London-Holyhead Trunk Road and Slip Roads and the (A49) Newport-Shrews-bury-Whitchurch-Warrington Trunk Road (A5/A49 Shrewsbury By-Pass and Improvements) Order 1985.
3. This Order shall come into force on 5th January 1990 and may be cited as the A5/A49 Trunk Roads (Shrewsbury Bypass and Improvements) (Temporary Bridge over the River Severn at Uffington, Shrewsbury) Order 1989.
Signed by authority of the Secretary of State
D. R. Ritchie
Regional Director West Midlands Region
Department of Transport
7th December 1989
From | a point on the north bank of the River Severn approximately 259m (283 yds) north east of the north corner of Ordnance Parcel 0026 and approximately 89m (97 yds) south west of the west corner of Ordnance Parcel 6879. |
To | a point on the south bank of the River Severn approximately 272m (297 yds) east of the north corner of Ordnance Parcel 0026 and approximately 133m (145 yds) south of the west corner of Ordnance Parcel 6879. |
Headroom | not less than 4.0m (13.1 feet) above normal river retention level to be maintained for a distance of 20.0m (21.9 yds) each side of the centre-line of the waterway. |
Waterway | as defined by the above limits. |